Notes From a Recent Planning Session
We spent a full morning in Kuching reviewing truss spacing for a chemical storage facility near the river. The client's original spec called for 6-meter bays, but the crane reach and bolt access made 4.5 meters more practical. This post walks through the load calculations we rechecked, the ventilation clearances that changed the ridge height, and why the coating spec had to be upgraded for the coastal humidity. If you are preparing a similar bid, the checklist at the end will save you a site visit.